Our tech team has launched updates to The Nest today. As a result of these updates, members of the Nest Community will need to change their password in order to continue participating in the community. In addition, The Nest community member's avatars will be replaced with generic default avatars. If you wish to revert to your original avatar, you will need to re-upload it via The Nest.

If you have questions about this, please email help@theknot.com.

Thank you.

Note: This only affects The Nest's community members and will not affect members on The Bump or The Knot.

UPDATE-Construction woes

We've run into our first construction problem (outside of the PITA neighbor).  They're currently doing the plumbing and the plumber said there wasn't enough fall from the toilet in the kids bathroom upstairs to the main pipe. 

So they want to put a 2 ft bumpout on the outside of the house for the pipe.  It would be right outside of our patio door.  Um no. 

Their next suggestion was to add a portion of wall into our main downstairs hallway (the one that leads from the front door past the stairs into the kitchen and family room).  Try again. 

Hey!  How about adding a bulkhead in your kitchen--hell no.

Then their next suggestion was a floor to ceiling cabinet in the kitchen next to the stove to house the pipe.  I briefly entertained this idea, but because the other cabinets in our kitchen don't go to the ceiling that was a no go as well. And I really don't want a sh!t pipe simmering next to my double ovens. 

On one hand I feel like we're being difficult, but the other part of me thinks that this is something that shouldn't have to be worked out in this phase.  It should have been worked out in the CAD phase.

This is a brand new house, not an old house that we're trying to make work.  Anything that they're going to add needs to work with the flow of the house.  I told them that they are free to add a sunroom in lieu of the bump-out.

 

WOOHOO! They looked into my suggestion of flipping the bathroom layout and it will work!  Crisis averted!  And--they've continued with the work.  The siding is going up and the electrician is working too.  Plumber will be back next week to finish up his work. 

 

imageBaby Birthday Ticker Ticker Baby Birthday Ticker Tickera>

Re: UPDATE-Construction woes

  •  Sorry to hear that, Amy. i would suggest thinking about all of the spaces between the kids bathroom and the main stack. Is there a place where tou would have less concern about having a bulkhead? Or a vertical spot where a stack could be hidden? Unless you can move the bathroom, an extra bulkhead is way worse than a toilet that doesn't drain properly. :-)

    Welcome to construction. The goal, of course, is to work everything out in paper before you build it. And maybe, if architects and engineers were given endless time to double check everything the plans would be perfect, but since we're human I doubt it. It's waaaay worse in renovation when you find surprises in the walls...

    Heather Margaret --- Feb '07 and Todd Eldon --- April '09

    image
  • The kitchen is the only space between the bathroom and the main stack in our bathroom.  My other suggestion was to flip the bathroom around (move toilet and tub from the left side to the right side and sink to the right side.  I'm waiting to hear if the extra few feet would give it enough fall. 
    imageBaby Birthday Ticker Ticker Baby Birthday Ticker Tickera>
  • Dude, that is BS.  We were able to run plumbing to a bedroom in our 90 year old house above the kitchen w/ no issues - they should be able to figure this *** out!
    Jen & T.J. 6.17.06 BabyBlog * my chart *
    Joseph Henry was born at home on March 9, 2009
    Nora Mae was born at home on October 30, 2011
    image
  • Oh, and our bathroom pipes go straight down into the basement and then they head over to the main stack from there... would that be an option for you?  They could hide it in any interior wall.
    Jen & T.J. 6.17.06 BabyBlog * my chart *
    Joseph Henry was born at home on March 9, 2009
    Nora Mae was born at home on October 30, 2011
    image
  • imageDomerJenC:
    Oh, and our bathroom pipes go straight down into the basement and then they head over to the main stack from there... would that be an option for you?  They could hide it in any interior wall.

    Apparently the issue is getting it to an interior wall to get it to the basement, where it would go to the main stack.  CAD is supposed to come back with a solution today. 